Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 32: Line 32:
 
:* (15+5') <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: #1,13.
 
:* (15+5') <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: #1,13.
 
:* (30+15') <font color=blue>''Hovanes Egiyan''</font>, [CPS: Conceptual design]: #2,3,4,10.
 
:* (30+15') <font color=blue>''Hovanes Egiyan''</font>, [CPS: Conceptual design]: #2,3,4,10.
<!-- :* <font color=blue>''Vitaly Baturin''</font>, [[media:ODUSEMINAR-03-02-2023-02.pdf | CPS: Conceptual design and Radiation factors:]] 2,3,4,10.-->
+
:* <font color=blue>''Vitaly Baturin''</font>, [[media:ODUSEMINAR-03-02-2023-02.pdf | CPS: Conceptual design and Radiation factors:]] 2,3,4,10
 
:* (20+15') <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin'', </font> [https://wiki.jlab.org/klproject/images/9/92/KLF2023b_Igor.pdf KPT: Conceptual design and Radiation factors]: #5,6,7,12.
 
:* (20+15') <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin'', </font> [https://wiki.jlab.org/klproject/images/9/92/KLF2023b_Igor.pdf KPT: Conceptual design and Radiation factors]: #5,6,7,12.
 
:* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: #8,12.
 
:* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: #8,12.

Revision as of 08:00, 1 July 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • (10+5') Patrizia Rossi, [Welcome and Introduction].
  • (20+15') Moskov Amaryan, K-long Facility in Hall D, and #9.
  • (15+5') Eugene Chudakov, [Hall D Status]: #12,13.
  • (15+5') Hovanes Egiyan, [Status of the project]: #1,13.
  • (30+15') Hovanes Egiyan, [CPS: Conceptual design]: #2,3,4,10.
  • Vitaly Baturin, CPS: Conceptual design and Radiation factors: 2,3,4,10
  • (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: #5,6,7,12.
  • (20+15') Mikhail Bashkanov, KL Flux Monitor: #8,12.
  • (20+15') Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13.
  • (20+15') Geoff Krafft, [Low repetition rate running and Laser status]: #9,10,11.
  • (20+15') Riad Suleiman, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11.
  • (20+15') Edith Nissen, [Electron beam characteristics]: #10.

Documents

Committee Report