Difference between revisions of "July 17th, 2023"

From kl project
Jump to navigation Jump to search
Line 8: Line 8:
  
 
* On July 10th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_10,_2023].
 
* On July 10th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_10,_2023].
:* (''Tim'')
+
:* Thermal analysis of CPS absorber in ANSYS (''Tim'').
:* (''Vitaly'')
+
:* Updates on the CPS model (''Pavel'').
 +
:* Updates on the CPS model (''Vitaly'').
 +
:* CPS presentation at ERR-I (''Hovanes'').
 +
:* CPS technical note (''Hovanes'', ''Pavel'').

Revision as of 16:55, 7 July 2023

Attended: Moskov, ...Igor.

  • Talks for ERR-I:


  • On July 10th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
  • Thermal analysis of CPS absorber in ANSYS (Tim).
  • Updates on the CPS model (Pavel).
  • Updates on the CPS model (Vitaly).
  • CPS presentation at ERR-I (Hovanes).
  • CPS technical note (Hovanes, Pavel).