Difference between revisions of "KLF Phase I ERR"
Jump to navigation
Jump to search
Line 35: | Line 35: | ||
:* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: [#8,12]. | :* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: [#8,12]. | ||
:* (20+15') <font color=blue>''Tim Whitlatch''</font>, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: [#2,3,5,6,12,13]. | :* (20+15') <font color=blue>''Tim Whitlatch''</font>, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: [#2,3,5,6,12,13]. | ||
− | :* (20+15') <font color=blue>''Geoff Krafft''</font>, [Low repetition rate running and Laser status]: [#9,10,11]. | + | :* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/5/5a/K-Long.pdf Low repetition rate running and Laser status]: [#9,10,11]. |
:* (20+15') <font color=blue>''Riad Suleiman''</font>, [Simultaneous beam delivery with parity quality beam]: [#9,10,11]. | :* (20+15') <font color=blue>''Riad Suleiman''</font>, [Simultaneous beam delivery with parity quality beam]: [#9,10,11]. | ||
:* (20+15') <font color=blue>''Edith Nissen''</font>, [Electron beam characteristics and beam diagnostics and locks]: [#10]. | :* (20+15') <font color=blue>''Edith Nissen''</font>, [Electron beam characteristics and beam diagnostics and locks]: [#10]. |
Revision as of 09:01, 13 July 2023
KLF Phase I ERR (August 2nd, 2023)
KLF Proposal
- KLF Proposal C12-19-001 e-Print: 2008.08215 [nucl-ex]
- KLF Wiki page
Charge
Committee
- Chad Bailey (Environment, Safety, & Health)
- Dan Carman (Kaon Flux Detector)
- Silviu Covrig Dusa (Be-Target)
- Jim Fast (Engineering + Costing) - Chair
- Joe Grames (Accelerator/KLF beam)
- Todd Satogata (Accelerator/KLF beam)
- Jim Shanks (CPS)
- Lorenzo Zana (CPS)
- Ed Folts (Division Safety Officer – Observer)
- Doug Higinbotham (Observer)
Tentative Agenda
- (10+5') Patrizia Rossi, [Welcome and Introduction].
- (20+15') Moskov Amaryan, K-long Facility in Hall D and [#9].
- (15+5') Eugene Chudakov, [Hall D Status]: [#12,13].
- (15+5') Hovanes Egiyan, [Status of the project]: [#1,13].
- (30+15') Hovanes Egiyan, [CPS: Conceptual design]: [#2,3,4,10].
- (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: [#5,6,7,12].
- (20+15') Mikhail Bashkanov, KL Flux Monitor: [#8,12].
- (20+15') Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: [#2,3,5,6,12,13].
- (20+15') Geoff Krafft, Low repetition rate running and Laser status: [#9,10,11].
- (20+15') Riad Suleiman, [Simultaneous beam delivery with parity quality beam]: [#9,10,11].
- (20+15') Edith Nissen, [Electron beam characteristics and beam diagnostics and locks]: [#10].
Documents
- [Compact Photon Source for Hall D at Jefferson Laboratory (Technical Note) ]
- Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)
- Kaon Flux Monitor for Hall D at Jefferson Laboratory (Technical Note)