Difference between revisions of "July 17th, 2023"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* On July 17th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_17,_2023]. | * On July 17th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_17,_2023]. | ||
+ | |||
* On July 10th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_10,_2023]. | * On July 10th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_10,_2023]. |
Revision as of 12:48, 15 July 2023
Attended: Moskov, ...Igor.
- Talks for ERR-I:
- (20+15') Moskov Amaryan, K-long Facility in Hall D, and #9.
- (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: #5,6,7,12.
- (20+15') Mikhail Bashkanov, KL Flux Monitor: #8,12.
- (20+15') Geoff Krafft, Considerations for Repetition Rate and Laser: [#9,10,11].
- On July 17th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
- On July 10th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Thermal analysis of CPS absorber in ANSYS (Tim)
- Updates on the CPS model (Pavel)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)
- Updates on the backup CPS model (Vitaly)