Difference between revisions of "July 17th, 2023"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
* Talks for ERR-I: | * Talks for ERR-I: | ||
− | :* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9. | + | :* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and [#9]. |
− | :* (20+15') <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin''</font>, [https://wiki.jlab.org/klproject/images/3/38/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2826%29.pdf KPT: Conceptual design and Radiation factors]: #5,6,7,12. | + | :* (20+15') <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin''</font>, [https://wiki.jlab.org/klproject/images/3/38/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2826%29.pdf KPT: Conceptual design and Radiation factors]: [#5,6,7,12]. |
− | :* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: #8,12. | + | :* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: [#8,12]. |
:* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/5/5a/K-Long.pdf Considerations for Repetition Rate and Laser]: [#9,10,11]. | :* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/5/5a/K-Long.pdf Considerations for Repetition Rate and Laser]: [#9,10,11]. | ||
Revision as of 12:50, 15 July 2023
Attended: Moskov, ...Igor.
- Talks for ERR-I:
- (20+15') Moskov Amaryan, K-long Facility in Hall D, and [#9].
- (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: [#5,6,7,12].
- (20+15') Mikhail Bashkanov, KL Flux Monitor: [#8,12].
- (20+15') Geoff Krafft, Considerations for Repetition Rate and Laser: [#9,10,11].
- On July 17th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
- On July 10th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Thermal analysis of CPS absorber in ANSYS (Tim)
- Updates on the CPS model (Pavel)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)
- Updates on the backup CPS model (Vitaly)