Difference between revisions of "July 17th, 2023"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
:* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/5/5a/K-Long.pdf Considerations for Repetition Rate and Laser]: [#9,10,11]. | :* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/5/5a/K-Long.pdf Considerations for Repetition Rate and Laser]: [#9,10,11]. | ||
:* (20+15') <font color=blue>''Riad Suleiman''</font>, [https://wiki.jlab.org/klproject/images/e/e6/KLF_Phase_I_ERR_MOLLER_suleiman.pdf Simultaneous beam delivery with parity quality beam]: [#9,10,11]. | :* (20+15') <font color=blue>''Riad Suleiman''</font>, [https://wiki.jlab.org/klproject/images/e/e6/KLF_Phase_I_ERR_MOLLER_suleiman.pdf Simultaneous beam delivery with parity quality beam]: [#9,10,11]. | ||
− | :* (10+5') <font color=blue>''Edy Nissen''</font>, [https://wiki.jlab.org/klproject/images/ | + | :* (10+5') <font color=blue>''Edy Nissen''</font>, [https://wiki.jlab.org/klproject/images/7/7f/KLF_ERR_Draft_%281%29.pdf Electron beam characteristics and beam diagnostics]: [#10]. |
Revision as of 21:20, 16 July 2023
Attended: Moskov, ...Igor.
- Talks for ERR-I/dry run:
- (20+15') Moskov Amaryan, K-long Facility in Hall D, and [#9].
- (15+5') Eugene Chudakov, [Hall D Status]: [#12,13].
- (15+5') Hovanes Egiyan, Status of KLF project: [#1,13].
- (30+15') Hovanes Egiyan and Pavel Degtyarenko , Conceptual Design of Compact Photon Source for KLF: [#2,3,4,10].
- (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: [#5,6,7,12].
- (20+15') Mikhail Bashkanov, KL Flux Monitor: [#8,12].
- (20+15') Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: [#2,3,5,6,12,13].
- (20+15') Geoff Krafft, Considerations for Repetition Rate and Laser: [#9,10,11].
- (20+15') Riad Suleiman, Simultaneous beam delivery with parity quality beam: [#9,10,11].
- (10+5') Edy Nissen, Electron beam characteristics and beam diagnostics: [#10].
- On July 10th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
- Thermal analysis of CPS absorber in ANSYS (Tim)
- Updates on the CPS model (Pavel)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)
- Updates on the backup CPS model (Vitaly)