Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 42: Line 42:
 
:* [Conceptual design of the Compact Photon Source for Hall D (Technical Note) ]
 
:* [Conceptual design of the Compact Photon Source for Hall D (Technical Note) ]
 
:* [https://wiki.jlab.org/klproject/images/3/38/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2826%29.pdf Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)]
 
:* [https://wiki.jlab.org/klproject/images/3/38/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2826%29.pdf Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)]
:* [https://wiki.jlab.org/klproject/images/3/3a/Flux_Monitor_%283%29.pdf Kaon Flux Monitor (Technical Note)]
+
:* [https://wiki.jlab.org/klproject/images/3/3a/Flux_Monitor_%283%29.pdf Kaon Flux Monitor (Technical Note)]<font color=red>*</font>
  
 
== Committee Report ==
 
== Committee Report ==

Revision as of 06:57, 18 July 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda for Dry Run

Documents

Committee Report