* On July 25th, we had a ''Marco'' muBDX@KLF/CPS meeting disciss the following... | * On July 25th, we had a ''Marco'' muBDX@KLF/CPS meeting disciss the following... | ||
− | :* [https://wiki.jlab.org/klproject/images/6/63/Antonino_Fulci_-_muBDX-KLCPS.pdf Tonino | + | :* [https://wiki.jlab.org/klproject/images/6/63/Antonino_Fulci_-_muBDX-KLCPS.pdf Tonino gave a short presentation] about the work he did in the old configuration and the integration in the new. |
− | :* We | + | :* We discussed: |
− | :** | + | :** Options to move upstream the whole CPS. |
− | :** | + | :** Options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline: |
− | :*** 1) | + | :** Options to shield the detector set up:*** 1) Increasing the permanent magnet Bdl or |
− | :*** 2) | + | :*** 2) Switching from a pure permanent to a permanent/powerd magnet |
− | :*** 3) | + | :*** 3) Adding a further magnet downstream. |
− | :** | + | :** Weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum. |
− | + | :** Other possible issues. | |
− | :** | + | :** Coordination with KLF Coll and Hall-D team. |
− | :** | ||
Revision as of 07:44, 26 July 2023
Attended: Moskov, ...Igor.
- On Aug 2nd, ERR-I is sceduled. All details are in [1].
- On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
- Tonino gave a short presentation about the work he did in the old configuration and the integration in the new.
- We discussed:
- Options to move upstream the whole CPS.
- Options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
- Options to shield the detector set up:*** 1) Increasing the permanent magnet Bdl or
- 2) Switching from a pure permanent to a permanent/powerd magnet
- 3) Adding a further magnet downstream.
- Weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum.
- Other possible issues.
- Coordination with KLF Coll and Hall-D team.
- On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Thermal analysis of the CPS absorber in ANSYS (Tim)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)