<b>Attended</b>: ''Moskov'', ...''Igor''.
+
<b>Attended</b>: ''Moskov'', ''Justin'', ''Mikhail'', ''Eugene'', ''Hovanes'', ''Tim'', ''Vitaly'', ''Pavel'', ''Riad'', ''Edy'', ''Igor'', ''Sean'' (after 9:00 am). ''Jeoff'' is traveling.
 +
 
 +
* On Aug 2nd, ERR-I is sceduled.  All details are in [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
 +
:* All three documents are ready for the review. 10 of 10 slides are ready for the review as well.
 +
 
 +
 
 +
* On July 25th, we had a ''Marco'' muBDX@KLF/CPS meeting disciss the following...
 +
:* [https://wiki.jlab.org/klproject/images/6/63/Antonino_Fulci_-_muBDX-KLCPS.pdf ''Tonino'' gave a short presentation] about the work he did in the old configuration and the integration in the new.
 +
:* We discussed:
 +
:** Options to move upstream the whole CPS.
 +
:** Options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
 +
:** Options to shield the detector set up:
 +
:*** 1) Increasing the permanent magnet Bdl or
 +
:*** 2) Switching from a pure permanent to a permanent/powerd magnet
 +
:*** 3) Adding a further magnet downstream.
 +
:** Weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum.
 +
:** Other possible issues.
 +
:** Coordination with KLF Coll and Hall-D team.
  
  
 
* On July 24th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_24,_2023].
 
* On July 24th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_24,_2023].
 
:* Thermal analysis of the CPS absorber in ANSYS (''Tim'')
 
:* Thermal analysis of the CPS absorber in ANSYS (''Tim'')
:* CPS presentation at ERR-1 (''Hovanes'')
+
:* [[media:cps_design_status_err1.pdf | CPS presentation at ERR-1]] (''Hovanes'')
 
:* [[media:CPS_design_for_HallD_ERR1.pdf | CPS technical note]] (''Hovanes'', ''Pavel'')
 
:* [[media:CPS_design_for_HallD_ERR1.pdf | CPS technical note]] (''Hovanes'', ''Pavel'')

Latest revision as of 20:05, 3 August 2023

Attended: Moskov, Justin, Mikhail, Eugene, Hovanes, Tim, Vitaly, Pavel, Riad, Edy, Igor, Sean (after 9:00 am). Jeoff is traveling.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].
  • All three documents are ready for the review. 10 of 10 slides are ready for the review as well.


  • On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
  • Tonino gave a short presentation about the work he did in the old configuration and the integration in the new.
  • We discussed:
    • Options to move upstream the whole CPS.
    • Options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
    • Options to shield the detector set up:
      • 1) Increasing the permanent magnet Bdl or
      • 2) Switching from a pure permanent to a permanent/powerd magnet
      • 3) Adding a further magnet downstream.
    • Weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum.
    • Other possible issues.
    • Coordination with KLF Coll and Hall-D team.


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].