Difference between revisions of "August 16th, 2023"

From kl project
Jump to navigation Jump to search
(Created page with " :* ''Cynthia Keppel'', Welcome Remarks, 15' :* Doug Higinbotham, "Summary for KLF ERR-I" 30' Tim Whitlatch - engineering work 20' Mikhail Bashkanov "The Flux Monitor - final...")
 
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
<b>Attended</b>: ''Moskov'', ... ''Igor''.
  
:* ''Cynthia Keppel'', Welcome Remarks, 15'
+
* Tentive agenda for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]):
:* Doug Higinbotham, "Summary for KLF ERR-I" 30'
+
:* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks].
Tim Whitlatch - engineering work 20'
+
:* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I].
Mikhail Bashkanov "The Flux Monitor - final design" 20'
+
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF].
Mikhail Bashkanov "Excited Omega baryon states at KLF" 20'
+
:* (15+5') <font color=blue>''Tim Whitlatch''</font>, [K-Long Engineering update].
Shukui Zhang "Status of the CEBAF photo-injector drive laser system for KL beam" 20'
+
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design].
 +
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam].
 +
 
 +
 
 +
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023].
 +
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]]
 +
:* CPS model update (''Pavel'')

Latest revision as of 23:18, 6 August 2023

Attended: Moskov, ... Igor.

  • Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
  • (10+5') Cynthia Keppel, [Welcome Remarks].
  • (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
  • (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
  • (15+5') Tim Whitlatch, [K-Long Engineering update].
  • (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
  • (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].


  • On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].