Difference between revisions of "August 11th, 2023"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | <b>Attended</b>: ''Moskov'', ... ''Igor''. | + | <b>Attended</b>: ''Moskov'', ... ''Igor''. ''Eugene'' is on the vacation. |
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023]. | * On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023]. |
Revision as of 11:39, 7 August 2023
Attended: Moskov, ... Igor. Eugene is on the vacation.
- On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
- Closeout Report
- CPS model update (Pavel)
- David Hamilton informed us that the Hall C CPS report that we submitted to lab management to get the C1 condition on E12-17-008 lifted.
- Tentive agenda for the KLF Collaboration meeting (September 19th [4]):
- (10+5') Cynthia Keppel, [Welcome Remarks].
- (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
- (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
- (15+5') Tim Whitlatch, [K-Long Engineering update].
- (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
- (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].