Difference between revisions of "January 10th, 2018"
(16 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | Attended: Mikhail, Mark, Moskov, Jim, Stuart, John, Avetik, and Igor: | ||
+ | |||
+ | Nick will miss our meeting because of the g14 meeting and Justin will do the same because of the departmental retreat while Dan is busy with Hall B running. | ||
+ | |||
+ | |||
+ | |||
As far as you know, PAC46 will be held during the week of July 16, 2018. | As far as you know, PAC46 will be held during the week of July 16, 2018. | ||
− | The deadline for submission of proposals and updates is 8:00 a.m. EDT (Eastern Daylight Time) on Monday, June 4, 2018 | + | The deadline for submission of proposals and updates is 8:00 a.m. EDT (Eastern Daylight Time) on Monday, June 4, 2018 [https://www.jlab.org/exp_prog/PACpage/PAC46/PAC46.html] . |
− | [https://www.jlab.org/exp_prog/PACpage/PAC46/PAC46.html] | + | The deadline for the GlueX Collaboration submission is May 4, 2018. |
− | |||
− | |||
− | |||
Briefly where we are now... | Briefly where we are now... | ||
− | 1) The expectation is to get a CPS conceptual design for Hall C by the end of January and start to implement it to Hall D. | + | 1) The expectation is to get a CPS conceptual design for Hall C by the end of January |
+ | [https://wiki.jlab.org/cuawiki/index.php/NPS/CPS_Collaboration_Meeting_(JLab,_1/23/18)] and start to implement it to Hall D. | ||
− | 2) We started MC for neutron and gamma yields from Be-target (Eugene | + | 2) We started MC for neutron and gamma yields from Be-target (Eugene approved a conceptual design) |
+ | [https://wiki.jlab.org/klproject/index.php/File:Target_XZ_CS_w_dimensions_(1).png]. 1st sample has a hole in W (full statistics). 2nd sample has a hole in Pb (full statistics for neutrons and small statistics for gammas) [https://wiki.jlab.org/klproject/images/c/ca/SumNG.xlsx] . For the 1st sample, the distribution of neutrons on front of LH2/LD2 target is shown [https://wiki.jlab.org/klproject/images/c/cb/Fign.jpg] . 3rd and 4th samples are coming. | ||
− | 3) Nick and Mikhail are doing MC for the KL-neutron scattering (KL+n-->K+Sigma-) using input from Maxim Mai | + | 3) Nick and Mikhail are doing MC for the KL-neutron scattering (KL+n-->K+Sigma-) using input from Maxim Mai. |
4) Nick will do MC for the Omega- production off the proton ? | 4) Nick will do MC for the Omega- production off the proton ? | ||
− | 5) Nick and Mikhail team will present a conceptual design of the facility to measure KL flux in mid of January (MS student project) | + | 5) Nick and Mikhail team will present a conceptual design of the facility to measure KL flux in mid of January (MS student project) [https://wiki.jlab.org/klproject/images/5/59/KLFM_v0.pptx]. |
+ | |||
+ | 6) PWA with quasi data will start in January using help of Cesar Ramires. | ||
+ | |||
+ | 7) Marouen is going to revise pion-kaon MC studies. | ||
+ | |||
+ | 8) PKI2018 is coming soon [https://www.jlab.org/conferences/pki2018/] . | ||
+ | |||
− | |||
− | + | The recent version of the KLF proposal is [https://wiki.jlab.org/klproject/images/7/7e/46_05.pdf] . |
Latest revision as of 19:01, 23 January 2018
Attended: Mikhail, Mark, Moskov, Jim, Stuart, John, Avetik, and Igor:
Nick will miss our meeting because of the g14 meeting and Justin will do the same because of the departmental retreat while Dan is busy with Hall B running.
As far as you know, PAC46 will be held during the week of July 16, 2018.
The deadline for submission of proposals and updates is 8:00 a.m. EDT (Eastern Daylight Time) on Monday, June 4, 2018 [1] . The deadline for the GlueX Collaboration submission is May 4, 2018.
Briefly where we are now...
1) The expectation is to get a CPS conceptual design for Hall C by the end of January [2] and start to implement it to Hall D.
2) We started MC for neutron and gamma yields from Be-target (Eugene approved a conceptual design) [3]. 1st sample has a hole in W (full statistics). 2nd sample has a hole in Pb (full statistics for neutrons and small statistics for gammas) [4] . For the 1st sample, the distribution of neutrons on front of LH2/LD2 target is shown [5] . 3rd and 4th samples are coming.
3) Nick and Mikhail are doing MC for the KL-neutron scattering (KL+n-->K+Sigma-) using input from Maxim Mai.
4) Nick will do MC for the Omega- production off the proton ?
5) Nick and Mikhail team will present a conceptual design of the facility to measure KL flux in mid of January (MS student project) [6].
6) PWA with quasi data will start in January using help of Cesar Ramires.
7) Marouen is going to revise pion-kaon MC studies.
8) PKI2018 is coming soon [7] .
The recent version of the KLF proposal is [8] .