Difference between revisions of "April 14th, 2020"

From kl project
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
* ''Shankar'' is shown us his results [https://wiki.jlab.org/klproject/images/9/95/KLF_progress_delta.pdf].
 
* ''Shankar'' is shown us his results [https://wiki.jlab.org/klproject/images/9/95/KLF_progress_delta.pdf].
  
* ''Kevin Luckas'' slides for the Annual APS Meeting [https://wiki.jlab.org/klproject/images/5/5c/Aps_draft_ver02.pdf].
+
* ''Kevin Luckas'' slides for the Annual APS Meeting [https://wiki.jlab.org/klproject/images/c/c8/APR20-2020-000769_ckimsduk.pdf].
  
  
Line 16: Line 16:
  
 
* New_Equipment [https://wiki.jlab.org/klproject/images/4/46/NewEquipment48.docx].
 
* New_Equipment [https://wiki.jlab.org/klproject/images/4/46/NewEquipment48.docx].
 +
 +
* Draft of the Raster document by Todd Satogata [https://wiki.jlab.org/klproject/images/1/1e/Paper.pdf].
  
 
* Potential timeline for the different stages of the design, construction, and installation of the KL beamline [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx].
 
* Potential timeline for the different stages of the design, construction, and installation of the KL beamline [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx].
  
 
* Cover_Letter [https://wiki.jlab.org/klproject/images/d/de/Cover48_v1.docx].
 
* Cover_Letter [https://wiki.jlab.org/klproject/images/d/de/Cover48_v1.docx].

Latest revision as of 10:09, 20 April 2020

Attended: Shankar, Moskov, Jim, Sean, Mikhail, Justin, and Igor

  • Should we have the 3rd KLF Collab meeting on May 11th or so? Let us make a KLF Collaboration meeting in a week of May 18th and make a final decision in 2 weeks.
  • JLab contact person for the KLF is Hovanes Egiyan.


  • Shankar is shown us his results [1].
  • Kevin Luckas slides for the Annual APS Meeting [2].


  • There are several people (Moskov, Shankar, Sean, Mikhail, Nick, Antimo, Kijun, and Andrey) who are working at overleaf [3] now to update our KL proposal (the current version is KLProposal_48.tex).


  • KLF_Analysis_ Report [4].
  • New_Equipment [5].
  • Draft of the Raster document by Todd Satogata [6].
  • Potential timeline for the different stages of the design, construction, and installation of the KL beamline [7].
  • Cover_Letter [8].