Difference between revisions of "April 14th, 2020"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
* ''Shankar'' is shown us his results [https://wiki.jlab.org/klproject/images/9/95/KLF_progress_delta.pdf]. | * ''Shankar'' is shown us his results [https://wiki.jlab.org/klproject/images/9/95/KLF_progress_delta.pdf]. | ||
− | * ''Kevin Luckas'' slides for the Annual APS Meeting [https://wiki.jlab.org/klproject/images/ | + | * ''Kevin Luckas'' slides for the Annual APS Meeting [https://wiki.jlab.org/klproject/images/c/c8/APR20-2020-000769_ckimsduk.pdf]. |
Line 16: | Line 16: | ||
* New_Equipment [https://wiki.jlab.org/klproject/images/4/46/NewEquipment48.docx]. | * New_Equipment [https://wiki.jlab.org/klproject/images/4/46/NewEquipment48.docx]. | ||
+ | |||
+ | * Draft of the Raster document by Todd Satogata [https://wiki.jlab.org/klproject/images/1/1e/Paper.pdf]. | ||
* Potential timeline for the different stages of the design, construction, and installation of the KL beamline [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx]. | * Potential timeline for the different stages of the design, construction, and installation of the KL beamline [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx]. | ||
* Cover_Letter [https://wiki.jlab.org/klproject/images/d/de/Cover48_v1.docx]. | * Cover_Letter [https://wiki.jlab.org/klproject/images/d/de/Cover48_v1.docx]. |
Latest revision as of 09:09, 20 April 2020
Attended: Shankar, Moskov, Jim, Sean, Mikhail, Justin, and Igor
- Should we have the 3rd KLF Collab meeting on May 11th or so? Let us make a KLF Collaboration meeting in a week of May 18th and make a final decision in 2 weeks.
- JLab contact person for the KLF is Hovanes Egiyan.
- Shankar is shown us his results [1].
- Kevin Luckas slides for the Annual APS Meeting [2].
- There are several people (Moskov, Shankar, Sean, Mikhail, Nick, Antimo, Kijun, and Andrey) who are working at overleaf [3] now to update our KL proposal (the current version is KLProposal_48.tex).
- KLF_Analysis_ Report [4].
- New_Equipment [5].
- Draft of the Raster document by Todd Satogata [6].
- Potential timeline for the different stages of the design, construction, and installation of the KL beamline [7].
- Cover_Letter [8].