Difference between revisions of "August 16th, 2023"
Jump to navigation
Jump to search
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | <b>Attended</b>: ''Moskov'', ... ''Igor''. | ||
− | * Tentive agenda for the KLF Collaboration meeting (September 19th []): | + | * Tentive agenda for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]): |
:* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks]. | :* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks]. | ||
:* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I]. | :* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I]. | ||
Line 7: | Line 8: | ||
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design]. | :* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design]. | ||
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam]. | :* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam]. | ||
+ | |||
+ | |||
+ | * On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023]. | ||
+ | :* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]] | ||
+ | :* CPS model update (''Pavel'') |
Latest revision as of 23:18, 6 August 2023
Attended: Moskov, ... Igor.
- Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
- (10+5') Cynthia Keppel, [Welcome Remarks].
- (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
- (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
- (15+5') Tim Whitlatch, [K-Long Engineering update].
- (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
- (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
- On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Closeout Report
- CPS model update (Pavel)