Difference between revisions of "August 16th, 2023"

From kl project
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
<b>Attended</b>: ''Moskov'', ... ''Igor''.
  
 
* Tentive agenda for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]):
 
* Tentive agenda for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]):
Line 9: Line 10:
  
  
* [[KLF_Phase_I_ERR |  Experimental Readiness Review Phase 1 ]] 
+
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023].
:* [[media:CPS_design_for_HallD_ERR1.pdf | CPS technical note]]
 
:* [[media:cps_design_status_err1.pdf | CPS presentation at ERR-1]]  
 
 
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]]
 
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]]
* CPS model update (Pavel)
+
:* CPS model update (''Pavel'')

Latest revision as of 23:18, 6 August 2023

Attended: Moskov, ... Igor.

  • Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
  • (10+5') Cynthia Keppel, [Welcome Remarks].
  • (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
  • (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
  • (15+5') Tim Whitlatch, [K-Long Engineering update].
  • (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
  • (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].


  • On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].