Difference between revisions of "June 28th, 2023"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
* On June 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_20,_2023]. | * On June 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_20,_2023]. | ||
:* Thermal analysis and thermal stress analysis in ANSYS (''Tim'') | :* Thermal analysis and thermal stress analysis in ANSYS (''Tim'') | ||
− | : * [[media:summary_thermal_mathematica_06_20_2023.pdf | Summary of thermal analysis of the models]] (''Hovanes'') | + | :* [[media:summary_thermal_mathematica_06_20_2023.pdf | Summary of thermal analysis of the models]] (''Hovanes'') |
:* Photon beam and material budget (''Pavel'') | :* Photon beam and material budget (''Pavel'') | ||
:* Radiation environment, material budget and photon beam quality (''Vitaly'') | :* Radiation environment, material budget and photon beam quality (''Vitaly'') |
Revision as of 15:10, 20 June 2023
Attended: Moskov, ..., and Igor.
- Agenda:
- 7th KLF Collab meeting is scheduled for September 19 [1].
- Our preparation for EER-I scheduled for the first week of August (Eugene).
- CPS status (Hovanes)
- KFM status (Mikhail)
- 128-ns status (Moskov)
- Engeneering work status (Eugene)
- KPT document is ready for ERR-I Conceptual design of KPT.
- KFM document is in progress.
- On June 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [6].
- Thermal analysis and thermal stress analysis in ANSYS (Tim)
- Summary of thermal analysis of the models (Hovanes)
- Photon beam and material budget (Pavel)
- Radiation environment, material budget and photon beam quality (Vitaly)
- Hovanes informed us that Patrizia is scheduled ERR-I for August 2nd. Committee is coming.