Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 28: Line 28:
 
:* <font color=blue>''Patrizia Rossi''</font> [Welcome and Introduction], <font color=magenta>10+5'</font>.
 
:* <font color=blue>''Patrizia Rossi''</font> [Welcome and Introduction], <font color=magenta>10+5'</font>.
 
:* <font color=blue>''Moskov Amaryan''</font> [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9, <font color=magenta>20+15'</font>.
 
:* <font color=blue>''Moskov Amaryan''</font> [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9, <font color=magenta>20+15'</font>.
:* <font color=blue>''Eugene Chudakov''</font> [Hall D Status and the Scope of Work]: #1,12,13, <font color=magenta>xx+yy'</font>.
+
:* <font color=blue>''Eugene Chudakov''</font> [Hall D Status]: #12,13, <font color=magenta>15+5'</font>.
 +
:* <font color=blue>''Hovanes Egiyan''</font> [Status of the project]: #1,13, <font color=magenta>15+5'</font>.
 
:* <font color=blue>''Hovanes Egiyan''</font> [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+15'</font>.
 
:* <font color=blue>''Hovanes Egiyan''</font> [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+15'</font>.
 
<!-- :* <font color=blue>''Vitaly Baturin''</font> [[media:ODUSEMINAR-03-02-2023-02.pdf | CPS: Conceptual design and Radiation factors:]] 2,3,4,10.-->
 
<!-- :* <font color=blue>''Vitaly Baturin''</font> [[media:ODUSEMINAR-03-02-2023-02.pdf | CPS: Conceptual design and Radiation factors:]] 2,3,4,10.-->

Revision as of 15:23, 30 June 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • Patrizia Rossi [Welcome and Introduction], 10+5'.
  • Moskov Amaryan K-long Facility in Hall D, and #9, 20+15'.
  • Eugene Chudakov [Hall D Status]: #12,13, 15+5'.
  • Hovanes Egiyan [Status of the project]: #1,13, 15+5'.
  • Hovanes Egiyan [CPS: Conceptual design]: #2,3,4,10, 30+15'.
  • Igor Strakovsky and Vitaly Baturin KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
  • Mikhail Bashkanov KL Flux Monitor: #8,12, 20+15'.
  • Tim Whitlatch [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, xx+yy'.
  • Geoff Krafft [Low repetition rate running and Laser status]: #9,10,11, 20+15'.
  • Riad Suleiman [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, 20+15'.
  • Edith Nissen [Electron beam characteristics]: #10, xx+yy'.

Documents