Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 35: Line 35:
 
:* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: [#8,12].
 
:* (20+15') <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: [#8,12].
 
:* (20+15') <font color=blue>''Tim Whitlatch''</font>, [[media:KLong_Engineering_status_err1.pdf | Engineering Status: K-long in Hall D]]: [#2,3,5,6,12,13].
 
:* (20+15') <font color=blue>''Tim Whitlatch''</font>, [[media:KLong_Engineering_status_err1.pdf | Engineering Status: K-long in Hall D]]: [#2,3,5,6,12,13].
:* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/5/5a/K-Long.pdf Considerations for Repetition Rate and Laser]: [#9,10,11].
+
:* (20+15') <font color=blue>''Geoff Krafft''</font>, [https://wiki.jlab.org/klproject/images/2/25/K-Long_%281%29.pdf Considerations for Repetition Rate and Laser]: [#9,10,11].
 
:* (20+15') <font color=blue>''Riad Suleiman''</font>, [https://wiki.jlab.org/klproject/images/e/e6/KLF_Phase_I_ERR_MOLLER_suleiman.pdf Simultaneous beam delivery with parity quality beam]: [#9,10,11].
 
:* (20+15') <font color=blue>''Riad Suleiman''</font>, [https://wiki.jlab.org/klproject/images/e/e6/KLF_Phase_I_ERR_MOLLER_suleiman.pdf Simultaneous beam delivery with parity quality beam]: [#9,10,11].
 
:* (10+5') <font color=blue>''Edy Nissen''</font>, [https://wiki.jlab.org/klproject/images/7/7f/KLF_ERR_Draft_%281%29.pdf Electron beam characteristics and beam diagnostics]: [#10].
 
:* (10+5') <font color=blue>''Edy Nissen''</font>, [https://wiki.jlab.org/klproject/images/7/7f/KLF_ERR_Draft_%281%29.pdf Electron beam characteristics and beam diagnostics]: [#10].

Revision as of 06:59, 17 July 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda for Dry Run

Documents

Committee Report