Difference between revisions of "April 25th, 2022"

From kl project
Jump to navigation Jump to search
Line 4: Line 4:
 
* On April 8th, we had a ''Hovanes''' CPS meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_April_8,_2022]. It has ''Vitaly's'' slides and was a long discussion with ''Pavel'' and radiation situation in the Tiger Hall. ''Pavel'' promised to do some estiamtions. ''Hovanes'' reported the extended magnetic field using OPERA which ''Vitaly'' will use in his CPS calculations.
 
* On April 8th, we had a ''Hovanes''' CPS meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_April_8,_2022]. It has ''Vitaly's'' slides and was a long discussion with ''Pavel'' and radiation situation in the Tiger Hall. ''Pavel'' promised to do some estiamtions. ''Hovanes'' reported the extended magnetic field using OPERA which ''Vitaly'' will use in his CPS calculations.
  
* On April 14th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/April_14,_2022_KLONG_Phase_II_Design_Meeting].
+
* On April 14th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/April_14,_2022_KLONG_Phase_II_Design_Meeting]. ''Tim'' said that one can accomplish the engineering design this summer of 2022, all looks promising. ''Hovanes'' is thinking about a diagnostics.

Revision as of 15:27, 14 April 2022

Attended: and Igor.


  • On April 8th, we had a Hovanes' CPS meeting for a development of the engineering design of the Tiger hall with CPS [1]. It has Vitaly's slides and was a long discussion with Pavel and radiation situation in the Tiger Hall. Pavel promised to do some estiamtions. Hovanes reported the extended magnetic field using OPERA which Vitaly will use in his CPS calculations.
  • On April 14th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]. Tim said that one can accomplish the engineering design this summer of 2022, all looks promising. Hovanes is thinking about a diagnostics.