Difference between revisions of "March 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 2: Line 2:
  
  
* On March 21th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_21,_2023].
+
* On March 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_20,_2023].
 
:* Temperature calculations (''Tim'').
 
:* Temperature calculations (''Tim'').
 
:* ''Vitaly's'' model.
 
:* ''Vitaly's'' model.

Revision as of 19:13, 13 March 2023

Attended: ... and Igor.


  • On March 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].
  • Temperature calculations (Tim).
  • Vitaly's model.


  • On March 13th, we had a meeting with Dave Harding and his FNAL colleagues to discuss a possibility to use FNAL EPB dipole for the CPS.


  • On March 6th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].