Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 28: Line 28:
 
== Tentative Agenda ==
 
== Tentative Agenda ==
 
:* (10+5') <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction].
 
:* (10+5') <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction].
:* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and [#9].
+
:* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D] and [#9].
 
:* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status]: [#12,13].
 
:* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status]: [#12,13].
 
:* (15+5') <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: [#1,13].
 
:* (15+5') <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: [#1,13].

Revision as of 09:11, 3 July 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • (10+5') Patrizia Rossi, [Welcome and Introduction].
  • (20+15') Moskov Amaryan, K-long Facility in Hall D and [#9].
  • (15+5') Eugene Chudakov, [Hall D Status]: [#12,13].
  • (15+5') Hovanes Egiyan, [Status of the project]: [#1,13].
  • (30+15') Hovanes Egiyan, [CPS: Conceptual design]: [#2,3,4,10].
  • (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: [#5,6,7,12].
  • (20+15') Mikhail Bashkanov, KL Flux Monitor: [#8,12].
  • (20+15') Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: [#2,3,5,6,12,13].
  • (20+15') Geoff Krafft, [Low repetition rate running and Laser status]: [#9,10,11].
  • (20+15') Riad Suleiman, [Simultaneous beam delivery with parity quality beam]: [#9,10,11].
  • (20+15') Edith Nissen, [Electron beam characteristics and beam diagnostics and locks]: [#10].

Documents

Committee Report