Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 26: Line 26:
 
:* <font color=blue>''Doug Higinbotham''</font> (Observer)
 
:* <font color=blue>''Doug Higinbotham''</font> (Observer)
  
== Tentative Agenda ==
+
== Tentative Agenda for Dry Run ==
 
:* (10+5') <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction].
 
:* (10+5') <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction].
 
:* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D] and [#9].
 
:* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D] and [#9].

Revision as of 15:53, 16 July 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda for Dry Run

Documents

Committee Report