Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 60: Line 60:
 
== Documents ==
 
== Documents ==
 
:* [Conceptual design of the Compact Photon Source for Hall D (Technical Note) ]<font color=red>*</font>
 
:* [Conceptual design of the Compact Photon Source for Hall D (Technical Note) ]<font color=red>*</font>
:* [https://wiki.jlab.org/klproject/images/3/38/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2826%29.pdf Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)]<font color=red>*</font>
+
:* [https://wiki.jlab.org/klproject/images/3/30/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2829%29.pdf Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)]
 
:* [https://wiki.jlab.org/klproject/images/7/78/Flux_Monitor_%285%29.pdf Kaon Flux Monitor (Technical Note)].
 
:* [https://wiki.jlab.org/klproject/images/7/78/Flux_Monitor_%285%29.pdf Kaon Flux Monitor (Technical Note)].
  
 
== Committee Report ==
 
== Committee Report ==
 
:* [].
 
:* [].

Revision as of 10:55, 21 July 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Agenda

Wednesday, August 2, 2023

  • 8:00-8:20 Closed Session.
  • 10:20-10:40 (20') Coffee Break.
  • 12:30-13:30 (60') Lunch.
  • 15:00-17:30 (30') Coffee Break - Closed Session.
  • 17:30 Closeout

Documents

Committee Report

  • [].