Difference between revisions of "July 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 5: Line 5:
  
 
* On July 25th, we had a ''Marco'' muBDX@KLF/CPS meeting disciss the following...
 
* On July 25th, we had a ''Marco'' muBDX@KLF/CPS meeting disciss the following...
:* [https://wiki.jlab.org/klproject/images/6/63/Antonino_Fulci_-_muBDX-KLCPS.pdf Tonino will give a short presentation] about the work he did in the old configuration and the integration in the new [].
+
:* [https://wiki.jlab.org/klproject/images/6/63/Antonino_Fulci_-_muBDX-KLCPS.pdf Tonino gave a short presentation] about the work he did in the old configuration and the integration in the new.
:* We shall discuss:
+
:* We discussed:
:** options to move upstream the whole CPS
+
:** Options to move upstream the whole CPS.
:** options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
+
:** Options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
:*** 1) increasing the permanent magnet Bdl or
+
:** Options to shield the detector set up:*** 1) Increasing the permanent magnet Bdl or
:*** 2) switching from a pure permanent to a permanent/powerd magnet
+
:*** 2) Switching from a pure permanent to a permanent/powerd magnet
:*** 3) adding a further magnet downstream
+
:*** 3) Adding a further magnet downstream.
:** options to shield the detector set up
+
:** Weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum.
:** weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
+
:** Other possible issues.
:** other possible issues  
+
:** Coordination with KLF Coll and Hall-D team.
:** coordination with KLF Coll and Hall-D team
 
  
  

Revision as of 08:44, 26 July 2023

Attended: Moskov, ...Igor.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].


  • On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
  • Tonino gave a short presentation about the work he did in the old configuration and the integration in the new.
  • We discussed:
    • Options to move upstream the whole CPS.
    • Options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
    • Options to shield the detector set up:*** 1) Increasing the permanent magnet Bdl or
      • 2) Switching from a pure permanent to a permanent/powerd magnet
      • 3) Adding a further magnet downstream.
    • Weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum.
    • Other possible issues.
    • Coordination with KLF Coll and Hall-D team.


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].