May 26th, 2020

From kl project
Revision as of 09:04, 14 May 2020 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: Igor.


  • Supplemental materials:

- Final version of KLF_Analysis_ Report (hyperon case) [].

- Final version of New_Equipment [].

- Final version of the Raster document [].

- Final version of the KFM [].

- Final version of the KPT [].

- Final version of the CPS [].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].

- Cover_Letter draft [].

- KLF_Analysis_ Report (meson case) is coming


  • The next meeting is scheduled for June 9th, 7AM [1]