KLF Phase I ERR
Jump to navigation
Jump to search
KLF Phase I ERR (August 2nd, 2023)
KLF Proposal
- KLF Proposal C12-19-001 e-Print: 2008.08215 [nucl-ex]
- KLF Wiki page
Charge
Committee
- Chad Bailey (Environment, Safety, & Health)
- Dan Carman (Kaon Flux Detector)
- Silviu Covrig Dusa (Be-Target)
- Jim Fast (Engineering + Costing) - Chair
- Joe Grames (Accelerator/KLF beam)
- Todd Satogata (Accelerator/KLF beam)
- Jim Shanks (CPS)
- Lorenzo Zana (CPS)
- Ed Folts (Division Safety Officer – Observer)
- Doug Higinbotham (Observer)
Agenda
Thursday, August 2, 2023
- 8:00-8:20 Closed Session.
- 8:20-8:25 (4+1') Chair [Welcome Remarks].
- 8:25-8:40 (10+5') Moskov Amaryan, K-long Facility in Hall D and [#9].*
- 8:40-9:05 (15+10') Eugene Chudakov, [Hall D Status]: [#12,13].*
- 9:05-9:30 (15+10') Hovanes Egiyan, Status of KLF project: [#1,13].*
- 9:30-10:20 (30+20') Hovanes Egiyan and Pavel Degtiarenko, Conceptual Design of Compact Photon Source for KLF: [#2,3,4,10].*
- 10:20-10:40 (20') Coffee Break.
- 10:40-11:20 (20+20') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: [#5,6,7,12].
- 11:20-11:55 (20+15') Mikhail Bashkanov, KL Flux Monitor: [#8,12].*
- 11:55-12:30 (20+15') Tim Whitlatch, Engineering Status: K-long in Hall D: [#2,3,5,6,12,13].*
- 12:30-13:30 (60') Lunch.
- 13:30-14:05 (20+15') Geoff Krafft, Considerations for Repetition Rate and Laser: [#9,10,11].*
- 14:05-14:40 (20+15') Riad Suleiman, Simultaneous beam delivery with parity quality beam: [#9,10,11].*
- 14:40-15:00 (10+10') Edy Nissen, Electron beam characteristics and beam diagnostics: [#10].*
- 15:00-17:30 (30') Coffee Break - Closed Session.
- 17:30 Closeout
Documents
- [Conceptual design of the Compact Photon Source for Hall D (Technical Note) ]*
- Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)*
- Kaon Flux Monitor (Technical Note).