KLF Phase I ERR

From kl project
Revision as of 10:48, 13 July 2023 by Igor (talk | contribs)
Jump to navigation Jump to search

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • (10+5') Patrizia Rossi, [Welcome and Introduction].
  • (20+15') Moskov Amaryan, K-long Facility in Hall D and [#9].
  • (15+5') Eugene Chudakov, [Hall D Status]: [#12,13].
  • (15+5') Hovanes Egiyan, [Status of the project]: [#1,13].
  • (30+15') Hovanes Egiyan, [CPS: Conceptual design]: [#2,3,4,10].
  • (20+15') Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: [#5,6,7,12].
  • (20+15') Mikhail Bashkanov, KL Flux Monitor: [#8,12].
  • (20+15') Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: [#2,3,5,6,12,13].
  • (20+15') Geoff Krafft, Considerations for Repetition Rate and Laser: [#9,10,11].
  • (20+15') Riad Suleiman, [Simultaneous beam delivery with parity quality beam]: [#9,10,11].
  • (20+15') Edith Nissen, [Electron beam characteristics and beam diagnostics and locks]: [#10].

Documents

Committee Report