May 26th, 2020
Jump to navigation
Jump to search
Attended: Igor.
- Supplemental materials:
- Final version of KLF_Analysis_ Report (hyperon case) [].
- Final version of New_Equipment [].
- Final version of the Raster document [].
- Final version of the KFM [].
- Final version of the KPT [].
- Final version of the CPS [].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
- Cover_Letter draft [].
- KLF_Analysis_ Report (meson case) is coming
- The next meeting is scheduled for June 9th, 7AM [1]