Agenda

  • Announcements
  • Beamline studies with GEANT4 (Richard)
  • Any other business

Minutes

Present: Hovanes, Pavel, Vitaly, Tim, Moskov, Eugene, Igor, Sashi, Beni, Richard, Mikhail, Marshall.



  • Pavel continues studying the option of 20% radiator. He included the tungsten material of KLF Active Collimator ~50cm in front of the KPT assembly.
  • Radiation dose rate from neutrons doubled compare to that without AC. γ-dose-rates did not change so much.
  • Tim commented that Active Collimator is attached to the KPT assembly and the long distance between KPT and AC may cause elevated radiation rates.





  • Eugene would like to see the same simulation with 10% radiator as he thinks it is suspicious that the temperature of the tungsten plug did not change. Hovanes pointed out that we have copper block around the Be-target with 20% radiator option. This takes away 2.8 KW power from reaching the tungsten plug.