Difference between revisions of "August 11th, 2023"

From kl project
Jump to navigation Jump to search
Line 18: Line 18:
 
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design].
 
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design].
 
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam].
 
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam].
 +
:* Discussion of Collaboration structure and participation (all)

Revision as of 12:29, 8 August 2023

Attended: Moskov, ... Igor. Eugene is on the vacation.

  • On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].


  • David Hamilton informed us that the Hall C CPS report that we submitted to lab management to get the C1 condition on E12-17-008 lifted.
  • In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to Bob McKeown and was reviewed by Patrizia): [2].
  • The original experimental proposal is here: [3]. We were fully re-approved by PAC51 two weeks ago.


  • Tentive agenda for the KLF Collaboration meeting (September 19th [4]):
  • (10+5') Cynthia Keppel, [Welcome Remarks].
  • (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
  • (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
  • (15+5') Tim Whitlatch, [K-Long Engineering update].
  • (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
  • (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
  • Discussion of Collaboration structure and participation (all)