Difference between revisions of "Cryomodule Shuffle"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
File:shuff3.jpg|SL21 Cryomodule Shuffle, this CM is stored along the south wall of the LERF vault | File:shuff3.jpg|SL21 Cryomodule Shuffle, this CM is stored along the south wall of the LERF vault | ||
File:shuff4.jpg|The base plates/support saddles are in different location for the C20/50 CEBAF modules than the C100 style modules. | File:shuff4.jpg|The base plates/support saddles are in different location for the C20/50 CEBAF modules than the C100 style modules. | ||
+ | File:shuff5.jpg| Base plate relocated ready for grout | ||
</gallery> | </gallery> |
Revision as of 10:38, 15 December 2017
The cryomodule shuffle took place on Dec. 8, 2017