Difference between revisions of "Cryo Process Review"

From LCLS-II testing
Jump to navigation Jump to search
Line 1: Line 1:
Series of discussions were held during the design process
+
The cryogenic process reviews were conducted as part of and after the cryo can design was completed.  A series of procedures were developed in collaboration with the Cryo group in order to document a set of steps for cooldown, warm up and the temperature bump (40K thermal cycle).  The set of procedures will be finalized and approved prior to the first cooldown in the LERF.  The procedures may be modified based on feedback after each use of the set of procedures.
  
 
[[July 19 2018]]
 
[[July 19 2018]]

Revision as of 15:49, 9 November 2018

The cryogenic process reviews were conducted as part of and after the cryo can design was completed. A series of procedures were developed in collaboration with the Cryo group in order to document a set of steps for cooldown, warm up and the temperature bump (40K thermal cycle). The set of procedures will be finalized and approved prior to the first cooldown in the LERF. The procedures may be modified based on feedback after each use of the set of procedures.

July 19 2018