Difference between revisions of "Gallery"

From LCLS-II testing
Jump to navigation Jump to search
Line 8: Line 8:
 
File:vvu.JPG | New "active" Voltage Verification Units (VVU) installed on 480VAC breaker panel
 
File:vvu.JPG | New "active" Voltage Verification Units (VVU) installed on 480VAC breaker panel
 
File:SSA Breaker.JPG | Location of first 8 Solid State Amplifiers & Breaker Panel
 
File:SSA Breaker.JPG | Location of first 8 Solid State Amplifiers & Breaker Panel
 +
File:Water_manifold.jpg|Water manifold for SSAs & Circulators in both zones are installed in the gallery
 
</gallery>
 
</gallery>

Revision as of 14:33, 4 April 2018