(Created page with " Notes from Kevin Jordan on trip Nov 8/9, 2017 to FermiLab ==Discussions/meetings held with: == Primary contact: Elvin Harms Met with John Anderson, Randy Zifko, Greg Giese...")
 
Line 1: Line 1:
  
 
Notes from Kevin Jordan on trip Nov 8/9, 2017 to FermiLab
 
Notes from Kevin Jordan on trip Nov 8/9, 2017 to FermiLab
 
  
 
==Discussions/meetings held with: ==
 
==Discussions/meetings held with: ==
 
Primary contact: Elvin Harms
 
Primary contact: Elvin Harms
  
Met with John Anderson, Randy Zifko, Greg Giese Safety/Interlocks group
+
Met with Elvin Harms & Genfa Wu at the CMTF
  
==LERF accomplishments this week:==
+
Met with Tug Akin; Cryomodule assembly
  
LERF ICD is has been released for official review. Curt met with the SLAC team Friday and finalized delivery dates for RF hardware and racks.     
+
Met with John Anderson, Randy Zifko, Greg Giese Safety/Interlocks group
 
 
Dave and Larry now have the needed lengths for ordering the Heliax cable, this will be completed later this week
 
 
 
Semi-annual Personnel Safety System re-certification complete
 
 
 
Daily activities can be seen at; https://wiki.jlab.org/lerf/index.php/Daily_Activities
 
 
 
P & ID diagram draft is posted https://wiki.jlab.org/lerf/images/9/94/P_ID_rev-draft.pdf
 
 
 
Safety Assessment document is in progress
 
 
 
The 480 VAC panel work for the SSA power is in progress
 
 
 
Tunnel is all cleaned up and ready for the shuffle, once the CEBAF style modules are moved out the waveguide will be prepared for the new installation.
 
 
 
A 36” deep rack was acquired from ‘free stock’ to hold the Dell R630, 29.5” deep servers
 
  
==Upcoming Activities:==
+
==CryoModule Test Facility Discussions ==
  
Cryomodule shuffle and two cryomodule removal from vault
 
  
Complete Safety Assessment document
 
  
Cable procurement – layout for RF, LLRF, Cryo, & Vac
+
==Next==
  
Server procurement (2) Dell R630’s
+
blah blah
  
 
----
 
----

Revision as of 21:13, 9 November 2017

Notes from Kevin Jordan on trip Nov 8/9, 2017 to FermiLab

Discussions/meetings held with:

Primary contact: Elvin Harms

Met with Elvin Harms & Genfa Wu at the CMTF

Met with Tug Akin; Cryomodule assembly

Met with John Anderson, Randy Zifko, Greg Giese Safety/Interlocks group

CryoModule Test Facility Discussions

Next

blah blah


A
Layout of cryomodules in accelerator vault, girders removed, cable lengths check (tape measure)
A
New style, commercial Voltage Verification Unit (VVU) for Lock, Tag, & Try on 480 VAC