(Created page with "* Remove waveguide in tunnel from zone 3 and 4 * Finish ceiling layout for waveguide supports * Start hanging waveguide in the tunnel * Get AC power to racks in gallery * Inst...") |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | * Remove waveguide in tunnel from zone 3 and 4 | + | [[Installation and welding activities]] |
− | * Finish ceiling layout for waveguide supports | + | |
− | * Start hanging waveguide in the tunnel | + | * Complete PSS connections |
− | * Get AC power to racks in gallery | + | * Turn on control power to SSAs |
− | * Install servers & UPS | + | * Finish CM # 1 tunnel waveguide |
− | * Move (crane) SSAs to gallery - when will #16 arrive? | + | * Start pulling and terminating cables |
+ | * Get Cryo-cons installed and operational | ||
+ | * Design water manifold for SSAs & Isolators | ||
+ | * Remove waveguide in tunnel from zone 3 and 4 - DONE | ||
+ | * Finish ceiling layout for waveguide supports - DONE | ||
+ | * Start hanging waveguide in the tunnel - STARTED | ||
+ | * Get AC power to racks in gallery - STARTED | ||
+ | * Hang tray over new racks - STARTED | ||
+ | * Install servers & UPS - DONE | ||
+ | * Move (crane) SSAs to gallery - DONE - when will #16 arrive? (March) | ||
+ | * Finalize design & procure false floor parts | ||
+ | * Pull cable... | ||
+ | * Terminate cable... | ||
+ | |||
+ | Cryo racks will be here in March | ||
+ | |||
+ | LLRF Racks arrive in early April | ||
+ | |||
+ | Magnet power supply racks arrive in ??? |
Latest revision as of 13:49, 19 July 2018
Installation and welding activities
- Complete PSS connections
- Turn on control power to SSAs
- Finish CM # 1 tunnel waveguide
- Start pulling and terminating cables
- Get Cryo-cons installed and operational
- Design water manifold for SSAs & Isolators
- Remove waveguide in tunnel from zone 3 and 4 - DONE
- Finish ceiling layout for waveguide supports - DONE
- Start hanging waveguide in the tunnel - STARTED
- Get AC power to racks in gallery - STARTED
- Hang tray over new racks - STARTED
- Install servers & UPS - DONE
- Move (crane) SSAs to gallery - DONE - when will #16 arrive? (March)
- Finalize design & procure false floor parts
- Pull cable...
- Terminate cable...
Cryo racks will be here in March
LLRF Racks arrive in early April
Magnet power supply racks arrive in ???