  • Remove waveguide in tunnel from zone 3 and 4
  • Finish ceiling layout for waveguide supports
  • Start hanging waveguide in the tunnel
  • Get AC power to racks in gallery
  • Install servers & UPS
  • Move (crane) SSAs to gallery - when will #16 arrive?