Difference between revisions of "X17/PRad II ERR"

From Pcrewiki
Jump to navigationJump to search
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
='''UDER CONSTRUCTION...'''=
+
='''UNDER CONSTRUCTION...'''=
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
='''The review will take place May 8-9, 2025'''=
 
='''The review will take place May 8-9, 2025'''=
Line 25: Line 14:
  
  
 
==Agenda (draft)==
 
 
<!--
 
* '''0:0''' Executive Session
 
* '''0:0'''    General overview of experiments (20 min) ''Ashot''
 
* '''0:0''' Overview of the experimental setup, required beam parameters (15 minutes) ''Ashot/Dipangkar''
 
* '''0:0'''    Run plan including commissioning (20 min)  ''Ashot/Dipangkar''
 
* '''0:0'''    HyCal (20 min)  ''Ashot''
 
* '''0:0''' PRad Target     (20 min) - ''Xiangdong''
 
* '''0:0'''    GEM (20 min) - ''Nilanga''
 
* '''0:0'''    DAQ, on-line and off-line software, trigger, slow controls (25 min) - ''Chao''
 
* '''0:0'''    Experiment configuration layout, pre-installation, and installation schedule (20 min)    ''Bob''
 
* '''0:0'''    Radiation dose on the calorimeter (15 min) ''Weizhi''
 
* '''0:0'''    Run documentation COO, ESAD, RSAD, etc.] (10 min) ''Eugene''
 
* '''0:0'''    Staffing of the experiment (shifts, Run coordinators)  (15 min)    ''Dipangar''
 
* '''0:0'''    Path to first publications (10 min) ''Haiyan''
 
* '''0:0'''    Executive Session
 
* '''0:0'''    Closeout
 
-->
 
  
 
=Materials for ERR=
 
=Materials for ERR=
Line 57: Line 26:
 
* [https://misportal.jlab.org/pacProposals/proposals/1759/attachments/152101/Proposal.pdf X17 Proposal]
 
* [https://misportal.jlab.org/pacProposals/proposals/1759/attachments/152101/Proposal.pdf X17 Proposal]
 
* [https://misportal.jlab.org/pacProposals/proposals/1565/attachments/127328/Proposal.pdf PRad II proposal]
 
* [https://misportal.jlab.org/pacProposals/proposals/1565/attachments/127328/Proposal.pdf PRad II proposal]
 +
* [https://wiki.jlab.org/pcrewiki/images/c/c3/PRad_II_Technical_Review_rev14.pdf C1 Technical Review Document]
 +
* [https://wiki.jlab.org/pcrewiki/index.php/File:PRadII-PAC48-Presented.pdf PAC48 Presentation]
 +
* [https://wiki.jlab.org/pcrewiki/images/1/14/PAC48_Report.pdf PAC48 Report for PRad-II]
 +
  
 
===Standard Run documentation===  
 
===Standard Run documentation===  

Revision as of 15:34, 28 March 2025

UNDER CONSTRUCTION...

The review will take place May 8-9, 2025

Review committe

Charge to the review

Here is the charge given to the PRad Collaboration for the PRad-II and Hidden Sector Search (X17) Experiments as written by Dr. Patrizia Rossi.

ERR Report

Materials for ERR

Presentations

Documentation


Standard Run documentation

  • Conduct of Operations (COO) (Eugene)
  • Experiment Safety Assessment Document (ESAD) (Eugene)
  • Radiation Safety Assessment Document (RSAD) (Eugene, Weizhi)
  • Hall B Emergency Response Guidelines (ERG) (Eugene)
  • Pre-run checkout (Rafo, Eugene)

Operational procedures for non-standard equipment

PRad Target

  • PRad Target ePAS (Xiangdong)
  • PRad Target Operation procedures (Xiangdong)

HyCal

  • HyCal ePAS (Eugene)
  • HyCal Operation procedures (Ashot,Eugene))
  • HyCal Transporter ePAS (Eugene, Krister)
  • HyCal Transporter Operation procedures (Eugene, Krister)

GEM

  • GEM ePAS (Florian)
  • GEM Operation procedures (Nilanga, Florian)

Vacuum Chamber

  • Vacuum Chamber ePAS (Bob)