Difference between revisions of "X17/PRad II ERR"
From Pcrewiki
Jump to navigationJump to searchLine 62: | Line 62: | ||
* Vacuum Chamber ePAS ''(Bob)'' | * Vacuum Chamber ePAS ''(Bob)'' | ||
+ | |||
+ | ====Scintillator Detector==== | ||
+ | * Scintillator ePAS ''(Eugene)'' | ||
+ | * Scintillator Operations procedures ''(Dipangkar)'' [https://wiki.jlab.org/pcrewiki/files/scintillator.pdf] |
Revision as of 14:02, 9 April 2025
UNDER CONSTRUCTION...
The review will take place May 8-9, 2025
Review committe
Charge to the review
ERR Report
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
- C1 Technical Review Document
- PAC48 Presentation
- PAC48 Report for PRad-II
Standard Run documentation
- Conduct of Operations (COO) (Eugene)
- Experiment Safety Assessment Document (ESAD) (Eugene)
- Radiation Safety Assessment Document (RSAD) (Eugene, Weizhi)
- Hall B Emergency Response Guidelines (ERG) (Eugene)
- Pre-run checkout (Rafo, Eugene)
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS (Xiangdong)
- PRad Target Operation procedures (Xiangdong)
HyCal
- HyCal ePAS (Eugene)
- HyCal Operation procedures (Ashot,Eugene))
- HyCal Transporter ePAS (Eugene, Krister)
- HyCal Transporter Operation procedures (Eugene, Krister)
GEM
- GEM ePAS (Florian)
- GEM Operation procedures (Nilanga, Florian)
Vacuum Chamber
- Vacuum Chamber ePAS (Bob)
Scintillator Detector
- Scintillator ePAS (Eugene)
- Scintillator Operations procedures (Dipangkar) [1]