Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
Line 49: Line 49:
 
==Documentation==
 
==Documentation==
  
*[https://www.jlab.org/exp_prog/proposals/12/C12-11-106.pdf Proposal of the E12-11-106 (PRad) experiment]  
+
* [https://www.jlab.org/exp_prog/proposals/12/C12-11-106.pdf Proposal of the E12-11-106 (PRad) experiment]  
*[https://wiki.jlab.org/pcrewiki/images/d/d2/HPS_to_PRAD_conversion_v2.pdf PRad Installation Schedule]
+
* Schedules
*[https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis]
+
** [https://wiki.jlab.org/pcrewiki/images/d/d2/HPS_to_PRAD_conversion_v2.pdf PRad Installation Schedule]
*[https://wiki.jlab.org/pcrewiki/images/2/25/PRad_Target_Operations.pdf PRad target operation manual]
+
** [            12GeV project schedule]
*[https://www.wiki.jlab.org/pcrwiki/ COO]
+
* Target
*[https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf ESAD]
+
** [https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis]
*[https://www.wiki.jlab.org/pcrwiki/ RSAD]
+
** [https://wiki.jlab.org/pcrewiki/images/2/25/PRad_Target_Operations.pdf PRad target operation manual]
*[https://www.wiki.jlab.org/pcrwiki/ ]
+
 
*[https://www.wiki.jlab.org/pcrwiki/ ]
+
* Vacuum vessel
 +
** [  Engineering calculations by vendor]
 +
** [  Additional engineering calculations by vendor]
 +
** [  Review of calculations by George Biallas]
 +
** [  Vacuum and pressure test results by vendor and certificates of materials]
 +
* Run documentation
 +
** [https://www.wiki.jlab.org/pcrwiki/ COO]
 +
** [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf ESAD]
 +
** [https://www.wiki.jlab.org/pcrwiki/ RSAD]
 +
** [https://www.wiki.jlab.org/pcrwiki/ ]
 +
** [https://www.wiki.jlab.org/pcrwiki/ ]

Revision as of 11:15, 5 November 2015


The review will take place at 8:30 am November 12, 2015 in L102



Agenda

  • 8:30 Executive Session
  • 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
  • 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
  • 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
  • 10:15 Coffee Break
  • 10:30 Target: parameters, safety (20 min) - Chris Keith
  • 10:50 GEM and DAQ integration (20 min) - Nilanga Liyanage
  • 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
  • 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
  • 12:00 PRad Beam Commissioning and Procedures (20 min) - Arne Freyberger
  • 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar/Mahbub
  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout

Materials for ERR

Presentations

Documentation

  • Vacuum vessel
    • [ Engineering calculations by vendor]
    • [ Additional engineering calculations by vendor]
    • [ Review of calculations by George Biallas]
    • [ Vacuum and pressure test results by vendor and certificates of materials]
  • Run documentation