Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to searchLine 48: | Line 48: | ||
*[https://www.jlab.org/exp_prog/proposals/12/C12-11-106.pdf Proposal of the E12-11-106 (PRad) experiment] | *[https://www.jlab.org/exp_prog/proposals/12/C12-11-106.pdf Proposal of the E12-11-106 (PRad) experiment] | ||
*[https://wiki.jlab.org/pcrewiki/images/d/d2/HPS_to_PRAD_conversion_v2.pdf Installation Schedule] | *[https://wiki.jlab.org/pcrewiki/images/d/d2/HPS_to_PRAD_conversion_v2.pdf Installation Schedule] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/2/25/PRad_Target_Operations.pdf PRad target operation manual] | ||
*[https://www.wiki.jlab.org/pcrwiki/ COO] | *[https://www.wiki.jlab.org/pcrwiki/ COO] | ||
*[https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf ESAD] | *[https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf ESAD] |
Revision as of 16:28, 4 November 2015
The review will take place at 8:30 am November 12, 2015 in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Nilanga Liyanage
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Arne Freyberger
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar/Mahbub
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- [https://www.wiki.jlab.org/pcrwiki/
- [https://www.wiki.jlab.org/pcrwiki/
- [https://www.wiki.jlab.org/pcrwiki/