Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
Line 58: Line 58:
  
 
* Vacuum vessel
 
* Vacuum vessel
** [  Engineering calculations by vendor]
+
** [https://wiki.jlab.org/pcrewiki/images/f/f2/J02351_Calcs.pdf   Engineering calculations by vendor]
** [  Additional engineering calculations by vendor]
+
** [https://wiki.jlab.org/pcrewiki/images/a/a6/JSA15-PO128_Addtional_Calculations.pdf   Additional engineering calculations by vendor]
** [  Review of calculations by George Biallas]
+
** [     Fabrication drawings ]
 +
** [https://wiki.jlab.org/pcrewiki/images/3/3d/PO_15-P0128_Drawing%2C_Calculation_Review-3.pdf   Review of calculations by George Biallas]
 
** [  Vacuum and pressure test results by vendor and certificates of materials]
 
** [  Vacuum and pressure test results by vendor and certificates of materials]
 
* Run documentation
 
* Run documentation

Revision as of 11:22, 5 November 2015


The review will take place at 8:30 am November 12, 2015 in L102



Agenda

  • 8:30 Executive Session
  • 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
  • 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
  • 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
  • 10:15 Coffee Break
  • 10:30 Target: parameters, safety (20 min) - Chris Keith
  • 10:50 GEM and DAQ integration (20 min) - Nilanga Liyanage
  • 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
  • 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
  • 12:00 PRad Beam Commissioning and Procedures (20 min) - Arne Freyberger
  • 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar/Mahbub
  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout

Materials for ERR

Presentations

Documentation