Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to searchLine 58: | Line 58: | ||
* Vacuum vessel | * Vacuum vessel | ||
− | ** [ Engineering calculations by vendor] | + | ** [https://wiki.jlab.org/pcrewiki/images/f/f2/J02351_Calcs.pdf Engineering calculations by vendor] |
− | ** [ Additional engineering calculations by vendor] | + | ** [https://wiki.jlab.org/pcrewiki/images/a/a6/JSA15-PO128_Addtional_Calculations.pdf Additional engineering calculations by vendor] |
− | ** [ Review of calculations by George Biallas] | + | ** [ Fabrication drawings ] |
+ | ** [https://wiki.jlab.org/pcrewiki/images/3/3d/PO_15-P0128_Drawing%2C_Calculation_Review-3.pdf Review of calculations by George Biallas] | ||
** [ Vacuum and pressure test results by vendor and certificates of materials] | ** [ Vacuum and pressure test results by vendor and certificates of materials] | ||
* Run documentation | * Run documentation |
Revision as of 11:22, 5 November 2015
The review will take place at 8:30 am November 12, 2015 in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Nilanga Liyanage
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Arne Freyberger
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar/Mahbub
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- [https://www.wiki.jlab.org/pcrwiki/
- [https://www.wiki.jlab.org/pcrwiki/
- [https://www.wiki.jlab.org/pcrwiki/
Documentation
- Proposal of the E12-11-106 (PRad) experiment
- Schedules
- PRad Installation Schedule
- [ 12GeV project schedule]
- Target
- Vacuum vessel
- Engineering calculations by vendor
- Additional engineering calculations by vendor
- [ Fabrication drawings ]
- Review of calculations by George Biallas
- [ Vacuum and pressure test results by vendor and certificates of materials]
- Run documentation