X17/PRad II ERR
From Pcrewiki
UNDER CONSTRUCTION...
The review will take place May 8-9, 2025
Review committe
- James Brock (Target)
- Dainnya Busbin (EHS)
- Eric Christy (GEM)
- Chris Cuevas (Electronics-DAQ)
- Hovanes Egiyan (Beamline)
- Igal Jaegle (MC Simulations)
- Mikhail Kostin (RadCon)
- Dave Mack (Calorimeter-Chair)
- Lubomir Pentchev (MC Simulations)
- Bill Rainey (EHS)
- Tim Whitlatch (Installation)
- Michael Tiefenback (Beamline)
- Ed Folts (Observer)
- Neville Malabre-O'Sullivan (Observer)
Charge to the review
ERR Report
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
- C1 Technical Review Document
- PAC48 Presentation
- PAC48 Report for PRad-II
Standard Run documentation
- Conduct of Operations (COO) (Eugene)
- Experiment Safety Assessment Document (ESAD) (Eugene)
- Radiation Safety Assessment Document (RSAD) (Eugene, Weizhi)
- Hall B Emergency Response Guidelines (ERG) (Eugene)
- Pre-run checkout (Rafo, Eugene)
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS (Xiangdong)
- PRad Target Operation procedures (Xiangdong)
HyCal
- HyCal ePAS (Eugene)
- HyCal Operation procedures (Ashot,Eugene))
- HyCal Transporter ePAS (Eugene, Krister)
- HyCal Transporter Operation procedures (Eugene, Krister)
GEM
- GEM ePAS (Florian)
- GEM Operation procedures (Nilanga, Florian)
Vacuum Chamber
- Vacuum Chamber ePAS (Bob)
Scintillator Detector
- Scintillator ePAS (Eugene)
- Scintillator Operations procedures (Dipangkar) [1]