Kerr - July 14, 2016

From Ciswikidb
Jump to navigation Jump to search
The new table setup, including the photodiode preamp system, the Lock-in Amplifier, SCU, scope, spectrum analyzer, and PEM.

Some Goals for the rest of the week include...

  • Reading more to understand difference between circular and linear birefringence
  • Reading about our setup the math and specifically the PEM
  • Calibrate the SCU, photodiode and better the setup
  • place mirror in system to see what null effect looks like





Abstract draft 1 ---> media:abstractdraft.docx