Uploads by Rlegg
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
06:36, 28 September 2015 | ApertureCheckv04.pptx (file) | 662 KB | Reza Kazimi's talk on beam loss on apertures in the GPT simulation. Interesting because it shows loss on A3. | 1 | |
06:34, 28 September 2015 | Full Energy Injector Meeting 25 September 25.pdf (file) | 130 KB | Minutes for the Sept 25, 2015 Full energy injector meeting. | 1 | |
12:45, 23 September 2015 | Wien filter revision.pdf (file) | 232 KB | Redesign of Wien filters to accomodate higher gun voltage. | 1 | |
12:38, 23 September 2015 | Injector incremental improvement list.pdf (file) | 44 KB | A list of more modest improvements which would improve injector performance. | 1 | |
06:23, 14 September 2015 | FullInjTalk 09-10-2015v4.pdf (file) | 3.41 MB | Reza's presentation on the machine group's intent for the injector upgrade. | 1 | |
07:56, 11 September 2015 | INJ Full Energy Injector Upgrade charter.pdf (file) | 212 KB | Original 2010 AIP CEBAF Injector Upgrade Charter document | 1 | |
07:44, 11 September 2015 | Minutes for Full Energy Inj Meeting 10Sept2015.pdf (file) | 233 KB | Minutes for the meeting on Sept 10th. Discussion revolved around the original charge for the work, what changes the machine group foresaw and what changes the Users thought were needed. | 1 | |
07:41, 11 September 2015 | Advanced injector specs 10sep2015.pdf (file) | 547 KB | Jay Benesch's slides on what the Users want in the way of injector upgrades to improve their experimental experience. | 1 | |
15:09, 27 August 2015 | Inj Upgrade Meeting 27Aug2015.pdf (file) | 186 KB | Minutes from initial planning meeting | 2 |