Difference between revisions of "Procedures"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
* [[Media:Vacuum_degas_profile_for_SS_update_October_2015.docx]] | * [[Media:Vacuum_degas_profile_for_SS_update_October_2015.docx]] | ||
* Electrode assembly [[Media:Procedure for assembling the electrode on an R30 inverted ceramic Rev01.docx]] | * Electrode assembly [[Media:Procedure for assembling the electrode on an R30 inverted ceramic Rev01.docx]] | ||
− | * Emittance Measurement: [[GTS Solenoid Scan Method]] | + | * Emittance Measurement: [[GTS Solenoid Scan Method]] – [[GTS Slit Scan Method]] |
Revision as of 12:25, 13 December 2016
- Media:Vacuum_degas_profile_for_SS_update_October_2015.docx
- Electrode assembly Media:Procedure for assembling the electrode on an R30 inverted ceramic Rev01.docx
- Emittance Measurement: GTS Solenoid Scan Method – GTS Slit Scan Method