Difference between revisions of "Data Acquisition System"
Jump to navigation
Jump to search
Line 38: | Line 38: | ||
==To-do List== | ==To-do List== | ||
+ | |||
* Get latest decoder | * Get latest decoder | ||
* Update MottOnline | * Update MottOnline | ||
* Add BPM Analysis | * Add BPM Analysis | ||
− | |||
* Add Block Readout | * Add Block Readout | ||
1- At one time, we used minicom to hard reboot the Mott DAQ | 1- At one time, we used minicom to hard reboot the Mott DAQ | ||
− | VME crate. This service was discontinued. Instead, we will | + | VME crate. This service was discontinued. Instead, we will |
− | use the | + | use the RS232 connection on the CAEN VME64X VME8200. |
− | RS232 connection on the CAEN VME64X VME8200. | + | 2- Upgrade opsmdaq0. |
− | + | 3- Now we have "opsmdaq0" and "iocmdaq1". It would be a | |
− | 2- | + | good idea to match names. |
− | + | 4- Standardize "msql" on opsmdaq0. | |
− | 3- Now we have "opsmdaq0" and "iocmdaq1". It would be a | + | 5- Upgrade from MVME6100/VxWorks to Intel/Linux CPU. |
− | good idea to match names. | ||
− | |||
− | 4- Standardize "msql" on opsmdaq0 | ||
− | |||
− | 5- |
Revision as of 08:24, 7 January 2014
DAQ Hardware
- Electronic Map of Mott Crates (January 29, 2013):
Media:ElectronicsMap_20130129.pdf
Media:ElectronicsMap_20130129.pptx
- Cabling of FADC, Scalers, and TDC (January 29, 2013):
- DAQ Timing (January 29, 2013):
Media:DAQ_Timing_20130129.pptx
DAQ Software
Manuals and References
- CAEN VME Crate Manual - VME8200 9U 21Slot (VME64x backplane with no P0 connector) media:VME8200_Manual.pdf
To-do List
* Get latest decoder * Update MottOnline * Add BPM Analysis * Add Block Readout
1- At one time, we used minicom to hard reboot the Mott DAQ VME crate. This service was discontinued. Instead, we will use the RS232 connection on the CAEN VME64X VME8200. 2- Upgrade opsmdaq0. 3- Now we have "opsmdaq0" and "iocmdaq1". It would be a good idea to match names. 4- Standardize "msql" on opsmdaq0. 5- Upgrade from MVME6100/VxWorks to Intel/Linux CPU.