Difference between revisions of "Fall SAD 2019"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
;Make beam again jobs | ;Make beam again jobs | ||
*Activate a photocathode | *Activate a photocathode | ||
+ | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19612 Remove, inspect, install FC2] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam] | ||
Revision as of 07:54, 20 August 2019
- Pre-planning for Aug-Nov SAD 2019
- media:190501_GunUpgradeJobs.docx
- media:30July2019_KryptonLine.pptx
- Gun2 Load Lock Chamber Replacement
- Beam studies before SAD begins
- Gun2 HV chamber jobs
- ATLIS to remove small shed from UITF and prep for CEBAF
- Gun2 200kV cathode, 10kV anode, kr plumbing
- Pete's BPM Atlis
- CEBAF Kr Gas HV Conditioning
- Gun2 Load chamber jobs
- Laser jobs
- Make beam again jobs
- Activate a photocathode
- Remove, inspect, install FC2
- Testing CEBAF w/ 200 keV beam
- AIPINJ
- Last SAD before upgrade
- Walk throughs and measurements
- Remove oil tank
- SAD Schedule and Beam Resstoration