Difference between revisions of "Fall SAD 2019"
Jump to navigation
Jump to search
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | ;Planning | + | ;Summer Beam Studies |
+ | *(not done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics] | ||
+ | *Bias anode [[media:190815_life.pptx]] | ||
+ | *(done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19410 Bias Gun2 anode during PREX-II] | ||
+ | |||
+ | ;Fall SAD Planning | ||
+ | *[https://accweb.acc.jlab.org/calendar/ SAD Calendar] | ||
*[[media:190501_GunUpgradeJobs.docx]] | *[[media:190501_GunUpgradeJobs.docx]] | ||
*[[media:30July2019_KryptonLine.pptx]] | *[[media:30July2019_KryptonLine.pptx]] | ||
*[[Gun2 Load Lock Chamber Replacement]] | *[[Gun2 Load Lock Chamber Replacement]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
;200 kV Gun Tasks | ;200 kV Gun Tasks | ||
− | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19616 S&A job for new small shed going into CEBAF] | + | *(done) [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 Remove small shed from UITF and prep for CEBAF] |
− | *[http://devweb.acc.jlab.org/CSUEApps/ | + | *(done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19616 S&A job for new small shed going into CEBAF] |
− | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing] | + | *(done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19516 Pete's BPM Atlis] |
− | + | *(done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing] | |
+ | :[https://logbooks.jlab.org/entry/3723083 Logbook entry of 200 kV cathode assembly] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19476 CEBAF Kr Gas HV Conditioning] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19476 CEBAF Kr Gas HV Conditioning] | ||
− | *[ | + | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19709 PM on chopper amps for 200 kV testing] |
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam] | ||
+ | :9/19/19 planning meeting [[media:190918_200keVbeam.docx]] | ||
− | ; | + | ;Injector SAD Tasks |
+ | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19463 Upgrade the loading chamber] | ||
+ | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386979P req 1] [https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386983 req 2] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19633 Remove oil tank] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19633 Remove oil tank] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19690 Install 2nd decarad unit] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19690 Install 2nd decarad unit] | ||
− | + | *(deferred) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19612 Remove, inspect, install FC2] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19612 Remove, inspect, install FC2] | ||
;PQB - SAD & CREX | ;PQB - SAD & CREX | ||
− | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19679 post-PREX II QE and AP measurements] | + | *(done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19679 post-PREX II QE and AP measurements] |
− | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19669 RTP & Spot Size measurements for PREX/CREX at 240,120,30Hz] | + | *(done) [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19669 RTP & Spot Size measurements for PREX/CREX at 240,120,30Hz] |
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18799 Cathode Rotation/Alignment for CREX] | *[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18799 Cathode Rotation/Alignment for CREX] | ||
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19670 RTP/IA/Parity Settings for all 4 lasers before CREX] | *[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19670 RTP/IA/Parity Settings for all 4 lasers before CREX] | ||
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18793 RTP: Position Difference Feedback PartI to FC2/FC1 for CREX] | *[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18793 RTP: Position Difference Feedback PartI to FC2/FC1 for CREX] | ||
− | |||
− |
Latest revision as of 12:45, 19 September 2019
- Summer Beam Studies
- (not done) Test large shed electrode optics
- Bias anode media:190815_life.pptx
- (done) Bias Gun2 anode during PREX-II
- Fall SAD Planning
- SAD Calendar
- media:190501_GunUpgradeJobs.docx
- media:30July2019_KryptonLine.pptx
- Gun2 Load Lock Chamber Replacement
- 200 kV Gun Tasks
- (done) Remove small shed from UITF and prep for CEBAF
- (done) S&A job for new small shed going into CEBAF
- (done) Pete's BPM Atlis
- (done) Gun2 200kV cathode, 10kV anode, kr plumbing
- 9/19/19 planning meeting media:190918_200keVbeam.docx
- Injector SAD Tasks
- Upgrade the loading chamber
- Upgrade fiber laser connectors req 1 req 2
- Remove oil tank
- Install 2nd decarad unit
- (deferred) Remove, inspect, install FC2
- PQB - SAD & CREX