Difference between revisions of "AIPINJ Layouts"

From Ciswikidb
Jump to navigation Jump to search
Line 5: Line 5:
  
 
==Gun Layouts==
 
==Gun Layouts==
 +
* Feb 26, 2020 [[media:BEAMLINELAYOUTFEB26.pdf]] edits post ME meeting, small corrections
 +
:sequence just before the gun valve goes like this if possible:  bellows + bpm/corr + valve.
 +
:remove the pink rectangular placeholders for quadrupoles
 +
:sequence after Vertical Wien:  viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
 +
:restore gap between the FG solenoids as exists in tunnel today
 +
:sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
 +
:if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
 
* Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
 
* Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
 
* Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
 
* Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1

Revision as of 21:40, 26 February 2020

Overall Layouts

Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

Gun Layouts

sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
remove the pink rectangular placeholders for quadrupoles
sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
restore gap between the FG solenoids as exists in tunnel today
sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown

Chopper Layouts

Booster Layouts

Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

-QCM was .32" further downstream. so all those interfaces moved.
-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
-YAO cavity was .37" longer than the design drawing.

Warm-RF Drawings

SRF Drawings