Difference between revisions of "March 12, 2020 - ME/INJ/CIS"

From Ciswikidb
Jump to navigation Jump to search
 
(17 intermediate revisions by one other user not shown)
Line 2: Line 2:
 
* What is the bellows type count, how may 3" and 3.5"?
 
* What is the bellows type count, how may 3" and 3.5"?
 
* Chris, do you have all as-founds you need?
 
* Chris, do you have all as-founds you need?
* Use C channel everywhere and move pedestals ok?
+
* Use C channel everywhere and move pedestals ok? => Anthony says yes, do it
: Anthony says yes, do it
 
 
* Carlos, send Shaun Wien feedthrough p/n
 
* Carlos, send Shaun Wien feedthrough p/n
* SS or Al brackets?
+
* SS or Al brackets? => Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support
: Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support
+
* Y-NEG chamber => Detail Y- 10" flange, NEG's here
* NEG chambers
+
* DP NEG chamber => Flip DP for IP beam left, modify for new NEG's?
: Detail Y- 10" flange, NEG's here
 
: Flip DP for IP beam left, modify for new NEG's?
 
 
* Laser vacuum window?
 
* Laser vacuum window?
: Caryn started evaluating
+
::[https://logbooks.jlab.org/entry/3801634 Caryn evaluated window types in air]
: Show layout of laser room, outrigger box, laser table
+
::[https://www.mdcvacuum.com/Products/US/Product/m.5.1.1.3/Section/m511/Category/m.5.1/Nonmagnetic_UHV_Series Show this one for now 2-3/4"]
: Shukui, tight, how to fit optics, inside laser room?
+
::Show layout of laser room, outrigger box, laser table
* 2I spools?
+
::Shukui, tight, how to fit optics, inside laser room?
: ME will order, need in time to a) weld capture solenoid, b) NEG coat
+
* 2I spools? => ME will order, need in time to a) weld capture solenoid, b) NEG coat
* New BPM's
+
* New BPM's => Design done, feedthroughs ordered, waiting on req to MDC
: Design done, feedthroughs ordered, waiting on req to MDC
 
 
* Solenoid fixtures?
 
* Solenoid fixtures?
 
* What is p/n for the 25S IP?
 
* What is p/n for the 25S IP?
 +
* Viewer top-hats
 +
::What is position when retracted for Y/Laser vs. crosses?
 +
::How many spares, do we need more or different?
 +
* Layout
 +
::Dennis can convert Elegant to S&A coordinates
 +
::Joe, map all the elements in an Excel file, punchlist CED & modifications
  
 
;Magnets
 
;Magnets
* Dipole
+
* [[200KV 15 deg dipole]]
: Emerson backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design
+
::Emerson Tesla (people making solenoids) backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design
* Soleonids
+
* [[Injector Solenoids Upgrade]]
: Joe M. what is status?
+
::First article complete ~April 20th:  After you receive, can you mount to the fixture plate, do your QC checks, hall probe checks....then ASAP, a 2.5" spool goes through, flanges get welded on, cleaned, then Phil needs 100 hours to NEG coat the spool, then 4 weeks later on May 18th it goes into CEBAF,
* Quads
+
* [[200kV Quadrupoles]]
:Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross)
+
::Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross)
 
* Correctors
 
* Correctors
: Joe G make tally
+
::Joe G tally
* Wien
+
* [[200kV Wien Filter]]
: Technicoil getting ready to wind
+
::Technicoil working on winding fixture
* PSS Kicker
+
* [[200kV PSS Kicker]]
: Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout)
+
::Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout)
 +
 
 +
;High Voltage
 +
* status of SS shed? (flange degased, ceramic welded, electrode cut, electrode polish, electrode mounted, fiducialize)
 +
* [[200kV Wien Filter]]
 +
:: Carlos, Gabriel finished evaluating UITF Wien, limited by field emission; Carlos and Bubba are reworking parts, thinking about new design
 +
 
 +
;RF
 +
[[200kV Choppers]]
 +
[[200kV Prebuncher]]
 +
::Hey Joe and Matt, we are building the parts now and hope to ship by the end of the month, then the cavity will be rf tested, sent back to us, and then returned to jlab for brazing.  We will do our best to not be the cause of any delays.  I will give you updates as the parts come together.  Thanks -Brock
  
 
;Orders
 
;Orders
Line 39: Line 51:
 
* Right angle valves - we have 5 or 6, should be ok?
 
* Right angle valves - we have 5 or 6, should be ok?
 
* Gun 10" flange - signed req for (2)
 
* Gun 10" flange - signed req for (2)
 +
* Order 10 kV feedthroughs
 
* BPM feedthroughs - ordered
 
* BPM feedthroughs - ordered
 
* BPM cans - waiting on req to MDC
 
* BPM cans - waiting on req to MDC
Line 44: Line 57:
 
;Controls
 
;Controls
 
* Chris, what cameras will you use, will they fit?
 
* Chris, what cameras will you use, will they fit?
 +
::Joe Yes we will be replacing all the old tube style cameras in the injector, and replacing them with the standard assembly that we have implemented through out the main machine as well as the KeV region in the UITF.
 
* Mark/Dave, do you have a plan for 2500W solid state chopper amps?
 
* Mark/Dave, do you have a plan for 2500W solid state chopper amps?
 
* Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
 
* Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
 
* Omar, do you have BPM channel?
 
* Omar, do you have BPM channel?
: Yes!
+
:: Yes!
 
* Remove hall probe
 
* Remove hall probe
 +
* Wien HV controls
 +
:: status of prototype test at UITF?
 +
:: layout in ISB racks?
 +
:: drops/penetrations?
 +
:: controls screens?
 +
* Wien Magnet PS
 +
:: layout in ISB racks?
 +
:: drops?
  
 
;Modelers
 
;Modelers
Line 57: Line 79:
 
* Can a YAG go at the laser screen, I don't think so?
 
* Can a YAG go at the laser screen, I don't think so?
 
* Is the beam envelope OK for ways we run spin rotators?
 
* Is the beam envelope OK for ways we run spin rotators?
: What are the currents and/or B's for the solenoids and quads?
+
:: What are the currents and/or B's for the solenoids and quads?
 +
::[[media:dennis_slides.pdf]]
 
* What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
 
* What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
 
* Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
 
* Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
:Jay is running cases
+
:: Jay is running cases
 
* Is the corrector/bpm downstream A1 useful?
 
* Is the corrector/bpm downstream A1 useful?
  
;Commissioning
+
;Assembly, Testing and Commissioning Plans
* Plan for May gun work?
+
* Plan for May gun work? [[media:200311_Gun2HVPlan.docx]]
* BPM job
+
* BPM job [[200KV gun BPM's]]
:Receive can/feedthroughs
 
:Clean
 
:Degas
 
:Coat
 
:Check feedthroughs, assemble feedthroughs
 
:Leak check cans
 
:electrical measurement
 
:serialize
 
:report K's and center
 

Latest revision as of 07:54, 12 March 2020

Mechanical
  • What is the bellows type count, how may 3" and 3.5"?
  • Chris, do you have all as-founds you need?
  • Use C channel everywhere and move pedestals ok? => Anthony says yes, do it
  • Carlos, send Shaun Wien feedthrough p/n
  • SS or Al brackets? => Use Al, now all 7-3/4" girder to beam line, girder holes whereever imagine support
  • Y-NEG chamber => Detail Y- 10" flange, NEG's here
  • DP NEG chamber => Flip DP for IP beam left, modify for new NEG's?
  • Laser vacuum window?
Caryn evaluated window types in air
Show this one for now 2-3/4"
Show layout of laser room, outrigger box, laser table
Shukui, tight, how to fit optics, inside laser room?
  • 2I spools? => ME will order, need in time to a) weld capture solenoid, b) NEG coat
  • New BPM's => Design done, feedthroughs ordered, waiting on req to MDC
  • Solenoid fixtures?
  • What is p/n for the 25S IP?
  • Viewer top-hats
What is position when retracted for Y/Laser vs. crosses?
How many spares, do we need more or different?
  • Layout
Dennis can convert Elegant to S&A coordinates
Joe, map all the elements in an Excel file, punchlist CED & modifications
Magnets
Emerson Tesla (people making solenoids) backed out, Milhous quoting round/square, Lakshimi working on Jay's AT design
First article complete ~April 20th: After you receive, can you mount to the fixture plate, do your QC checks, hall probe checks....then ASAP, a 2.5" spool goes through, flanges get welded on, cleaned, then Phil needs 100 hours to NEG coat the spool, then 4 weeks later on May 18th it goes into CEBAF,
Have 3 QW, Mike testing 2 spare QW quads (capture on welded cross)
  • Correctors
Joe G tally
Technicoil working on winding fixture
Met w/ Jerry, Lakshimi working on upgraded kicker to move 200 keV beam 1cm @ 30 cm w < 200 mA (March 9 layout)
High Voltage
  • status of SS shed? (flange degased, ceramic welded, electrode cut, electrode polish, electrode mounted, fiducialize)
  • 200kV Wien Filter
Carlos, Gabriel finished evaluating UITF Wien, limited by field emission; Carlos and Bubba are reworking parts, thinking about new design
RF

200kV Choppers 200kV Prebuncher

Hey Joe and Matt, we are building the parts now and hope to ship by the end of the month, then the cavity will be rf tested, sent back to us, and then returned to jlab for brazing. We will do our best to not be the cause of any delays. I will give you updates as the parts come together. Thanks -Brock
Orders
  • Bellows - waiting on final count
  • Right angle valves - we have 5 or 6, should be ok?
  • Gun 10" flange - signed req for (2)
  • Order 10 kV feedthroughs
  • BPM feedthroughs - ordered
  • BPM cans - waiting on req to MDC
Controls
  • Chris, what cameras will you use, will they fit?
Joe Yes we will be replacing all the old tube style cameras in the injector, and replacing them with the standard assembly that we have implemented through out the main machine as well as the KeV region in the UITF.
  • Mark/Dave, do you have a plan for 2500W solid state chopper amps?
  • Mark/Dave, do you have a plan for Brock prebuncher cavity/amp?
  • Omar, do you have BPM channel?
Yes!
  • Remove hall probe
  • Wien HV controls
status of prototype test at UITF?
layout in ISB racks?
drops/penetrations?
controls screens?
  • Wien Magnet PS
layout in ISB racks?
drops?
Modelers
  • Is the March 9th layout ok?
  • Is the harp location OK for solenoid scans?
  • Should a viewer remain at the harp location, should this be a YAG?
  • Where else should YAG's go?
  • Can a YAG go at the laser screen, I don't think so?
  • Is the beam envelope OK for ways we run spin rotators?
What are the currents and/or B's for the solenoids and quads?
media:dennis_slides.pdf
  • What are the power levels for existing or Brock prebuncher cavities, for 130 or 200 keV locations?
  • Is distance from MFG1I04A to upstream corrector far enough? or move MFG1I04A downstream, how far?
Jay is running cases
  • Is the corrector/bpm downstream A1 useful?
Assembly, Testing and Commissioning Plans